Quality Assured Firm


Projects

 

AT&T Wireless
  • Main computer room (MDF) complete with five new Ortronics Mighty Mo 19" equipment racks and approximately twenty-five 24-port patch panels for both voice and data.
  • Horizontal cabling installation totaling approximately 200,000 feet of CAT 5e cable.
  • All terminations and testing for the above (approximately 992 drops for 248 locations).
  • Termination and testing of 600 pair voice backbone cabling.
  • Click here for more info
ATT

 


Recticel
Recticel
  • Designed and installed by cTec
  • Category 6 horizontal cabling infrastructure
  • 50/125 micron, multi-mode, fiber optic cable backbone
  • 26 year Mohawk SystemMATE Warranty provided
  • Bogen paging system designed and installed
  • Click here for more info
Recticel Building

 


NWA McNamara Terminal
NWA McNamara Terminal
  • Installation of all cross connections between Ameritech Centrex switch and premise horizontal backbone (approximately 5,000)
  • All cross reference documentation
  • Procured and installed all phone handsets for facility
  • Installation of backbone and horizontal fiber and copper cabling throughout facility
  • Year round on-site presence
  • Click here for more info
NWA McNamara Terminal

 


Kmart Corporation
  • Retrofit and MAC work for the communications infrastructure system throughout the entire campus
  • Complete renovation of existing facility audio control system
  • Designed and installed new cable tray support system required for the Main Server Farm room
  • Click here for more info
Kmart Corporation

 


GM PCC North
  • Installation of communications infrastructure cabling for 3,100 locations
  • Complete ABF fiber backbone system (5.5 miles of fiber and 720 terminations)
  • Complete copper voice backbone system (8,400 pairs throughout facility including four 1,800 pair splices)
  • A 20 year Siemon Cabling Systems UltraLink Warranty was provided
  • 2.5 Million feet of Cat 5e cable installed, terminated, and tested
  • Click here for more info
GM PCC North

 


Electronic Data Systems
  • Installation of communications infrastructure cabling for 2,365 locations throughout the entire 21 floors of the 500 Tower at the GM Renaissance Center
  • Complete fiber backbone system
  • Complete copper voice backbone system
  • All RF coaxial cabling, terminations, and testing for the video transmission system.
  • A 20 year Siemon Cabling Systems UltraLink Warranty was provided.
Electronic Data Systems

 

Citi Corp Offices Southfield MI
  • Completed in 9 week timeframe
  • 4,500 Category 6 cables (over 1 million feet) were installed, terminated, tested and certified.
  • 276 strands of multi mode fiber were installed, terminated, tested and certified.
  • 48 strands of single mode fiber were installed, terminated, tested and certified.
  • Click here for more info
Electronic Data Systems

 

GM Milford Proving Ground MI
  • Complete new conventional fiber backbone system throughout the entire campus between six buildings totaling approximately 10.6 miles of cabling and over 8,000 fiber fusion splices.
  • Complete fiber infrastructure testing and documentation for all installed fiber.
  • Over 1 mile of 4" conduit with numerous pull boxes was installed in high difficulty areas throughout the campus.
  • Click here for more info
Electronic Data Systems

 

Windemere Park Senior Community
  • The entire Category 5e structured cabling system was designed, installed and certified by Center Line Technologies .
  • The telephone copper backbone system was completely upgraded and certified.
  • A complete theatre presentation and surround sound audio system was designed and installed .
  • Click here for more info
Electronic Data Systems

 

 