Projects |
|
- Main computer room (MDF) complete
with five new Ortronics Mighty Mo 19" equipment
racks and approximately twenty-five 24-port patch
panels for both voice and data.
- Horizontal cabling installation totaling
approximately 200,000 feet of CAT 5e cable.
- All terminations and testing for
the above (approximately 992 drops for 248 locations).
- Termination and testing of
600 pair voice backbone cabling.
- Click
here for more info
|
|
|
- Designed and installed by cTec
- Category 6 horizontal cabling
infrastructure
- 50/125 micron, multi-mode,
fiber optic cable backbone
- 26 year Mohawk SystemMATE Warranty
provided
- Bogen paging system designed
and installed
- Click
here for more info
|
|
|
|
|
- Installation of all cross connections
between Ameritech Centrex switch and premise horizontal
backbone (approximately 5,000)
- All cross reference documentation
- Procured and installed all phone
handsets for facility
- Installation of backbone and horizontal
fiber and copper cabling throughout facility
- Year round on-site presence
- Click here for
more info
|
|
|
|
- Retrofit and MAC work for the communications
infrastructure system throughout the entire campus
- Complete renovation of existing
facility audio control system
- Designed and installed new cable
tray support system required for the Main Server
Farm room
- Click here
for more info
|
|
|
- Installation of communications infrastructure
cabling for 3,100 locations
- Complete ABF fiber backbone system
(5.5 miles of fiber and 720 terminations)
- Complete copper voice backbone system
(8,400 pairs throughout facility including four
1,800 pair splices)
- A 20 year Siemon Cabling Systems
UltraLink Warranty was provided
- 2.5 Million feet of Cat 5e cable
installed, terminated, and tested
- Click here for
more info
|
|
|
- Installation of communications infrastructure cabling for 2,365 locations throughout the entire 21 floors of the 500 Tower at the GM Renaissance Center
- Complete fiber backbone system
- Complete copper voice backbone system
- All RF coaxial cabling, terminations, and testing for the video transmission system.
- A 20 year Siemon Cabling Systems UltraLink Warranty was provided.
|
|
|
- Completed in 9 week timeframe
- 4,500 Category 6 cables (over 1 million feet) were installed, terminated, tested and certified.
- 276 strands of multi mode fiber were installed, terminated, tested and certified.
- 48 strands of single mode fiber were installed, terminated, tested and certified.
- Click here for more info
|
|
|
- Complete new conventional fiber backbone system throughout the entire campus between six buildings totaling approximately 10.6 miles of cabling and over 8,000 fiber fusion splices.
- Complete fiber infrastructure testing and documentation for all installed fiber.
- Over 1 mile of 4" conduit with numerous pull boxes was installed in high difficulty areas throughout the campus.
- Click here for more info
|
|
|
- The entire Category 5e structured cabling system was designed, installed and certified by Center Line Technologies .
- The telephone copper backbone system was completely upgraded and certified.
- A complete theatre presentation and surround sound audio system was designed and installed .
- Click here for more info
|
|
|
|