Projects -
GM Milford
|
Milford,
MI |
|
Center Line Technologies recently completed a $715,000 dollar project for General Motors at the General Motors Proving Grounds in Milford, MI which entailed the following:
- Complete new conventional fiber backbone system throughout the entire campus between six buildings totaling approximately 10.6 miles of cabling and over 8,000 fiber fusion splices.
- Complete fiber infrastructure testing and documentation for all installed fiber.
- All associated innerduct, cable tray, slack storage units, racks, and equipment associated with the installation of the fiber.
- Over 1 mile of 4" conduit with numerous pull boxes was installed in high difficulty areas throughout the campus.
- Horizontal cabling installation totaling approximately 25 miles of CAT 5e Commscope cable.
- All terminations and testing for the above (approximately 768 locations).
- An AFL Certified Link Warranty was obtained for the entire installation.
|
|
|
|